Software Best Practices

Voices on Software Development Best Practices
Welcome to Software Best Practices Sign in | Join | Help
in Search

Browse by Tags

All Tags » Quality measurements (RSS)
  • Re: Question about Defect Density Metric

    Fully agree that the metrics has better be used for chronological comparison. Well a lot of factors influencing the calculation: projects using different languages: C++, C#, Java project scaling from a hundred lines of code, to 200,000 lines of code; size affecting density projects having different natures...
    Posted to Forum by Frank Lei on 07-29-2009
  • Re: Six Sigma approach to measuring Developer productivity

    In my opinion there are two distinct topics here; "the measure" and "what you do with the measure". The Measure This is an interesting measure. It does indeed (from a mathematical point of view) have some desirable qualities. It appears to be scale invariant. That is, it would allow...
    Posted to Forum by brucehenry on 06-08-2007
  • Re: Six Sigma approach to measuring Developer productivity

    It's not enough to see who last checked in the code. If they were working together as in our buddying system, either of them could have checked it out. It's relatively easy to allocate responsibility (=blame?) to one or other developer but measuring effective productivity is much difficult than...
    Posted to Forum by bob_lloyd on 05-28-2007
Page 1 of 1 (3 items)
Seminars           www.Construx.com           Consulting